
No-code integration platform for rich bi-directional sync

Zero downtime migration to tool of your choice

Keep Historical Data, Without Slowing Down Your Tools

Migrate or restructure Azure DevOps

Real-time, context-rich data lake for AI or analytics
By Role
Accelerate delivery with clear insights

Accelerate delivery with clear insights

Transform smarter with a connected digital thread

Confident transitions for every enterprise change
By Initiative

Modernize and move to cloud without disruption

Build a compliant digital thread for complex environments

Build the foundation for smarter AI
By Domain

No-code integration across teams and systems

Enable collaboration between IT, support, and business teams

Connect PLM & engineering teams for smarter products

Ensure regulatory compliance from start to release

Explore the latest in technology best practices

Success stories from the field

Actionable insights for your business challenges.

See solutions in action

Learn, plan, and execute with confidence

Official announcements and updates

Join discussions that drive results

Stay ahead with curated insights

Evaluate before you buy
Take Control of Your Jira Data Center to Cloud Migration.
Use OpsHub Migration Manager alongside JCMA to manage migration to execute your Jira Cloud migration with greater control:
Source: Forrester, The Total Economic Impact of Cloud Migrations





































01
Your Data Center instance can afford a scheduled weekend window. JCMA migrates structure, data, and users to Cloud in a single phase.
02
OMM runs delta sync in the background so Jira Cloud stays current while Data Center remains live. The final cutover takes minutes, not days.
03
OMM bi-directional sync keeps both sides current. Centralized reporting stays on Data Center while migrated teams already work on Cloud.
04
Active projects move to Cloud. Dormant and retired projects move into a searchable, read-only archive with OpsHub Archive Manager (OAM).
05
OMM merges Data Center and Cloud instances into a single site. Key collisions and duplicate users are resolved by rule before anything moves.
OMM delta sync keeps Jira Cloud current in the background so Data Center stays live. The final cutover takes minutes instead of a weekend freeze.
OMM bi-directional sync supports phased onboarding and compliance-driven transitions where neither side can fall behind.
OMM project-level migration removes the all-or-nothing cutover. IT can go first, other departments follow when they are ready.
OMM transformation and field mapping lets you restructure custom fields, consolidate workflows, and redesign schemes as data migrates.
OMM multi-instance consolidation resolves key conflicts and deduplicates users by rule, including Cloud-to-Cloud merges.
OMM per-record reconciliation surfaces every mismatch in the UI so nothing is lost without a trace.
| Migration scenario | JCMA | JCMA + OMM |
|---|---|---|
| Straightforward lift-and-shift to Cloud | ✓ | ✓ |
| Standard Atlassian-supported migration | ✓ | ✓ |
| Large-scale enterprise migration | — | ✓ |
| Migration with minimal business disruption | — | ✓ |
| Phased rollout by project, team, or business unit | — | ✓ |
| Complex data and configuration transformation | — | ✓ |
| Parallel Data Center and Cloud operation | — | ✓ |
| Advanced migration control and orchestration | — | ✓ |
| Per-record reconciliation and recovery | — | ✓ |
A logistics company with 10,000+ Jira users migrated 2,800+ projects across six phased waves. Data Center stayed live throughout. Sprints continued. No freeze window, no SLA breaches, 100% data fidelity.
Jira projects migrated
Issues Moved to Cloud
Change Events Preserved
Downtime or Data Loss
Plan every step of your migration with precision. Download the checklist now!
Marketplace apps lose their data when Jira Data Center moves to Cloud.
Apps without a native Cloud path lack a cutover destination, especially test tools and custom trackers.
OMM maps app data across vendors before the Jira Cloud migration starts.
App data routes to a different Cloud app, native Jira fields, or a dedicated archive before anything moves.
A messy Data Center configuration gets copied into Jira Cloud as-is.
Fields, workflows, & schemes that needed cleanup get replicated into Cloud. The rework happens after go-live instead of before.
OMM restructures Data Center on a clone while JCMA migrates the clean version.
The redesign happens on a non-production clone, not in the live Data Center. OMM keeps the clone current while you clean.
There is no way back to Data Center once teams cut over to Cloud.
A validation issue after cutover has nowhere to reconcile without a sync running in both directions.
OMM bi-directional sync keeps both Data Center and Cloud current until you are ready.
Both sides stay current. Retire the sync only when the validation milestone clears.
A single cutover window turns into a long outage for every Jira user.
Without delta sync keeping Cloud current, the entire Jira Data Center migration is one scheduled freeze.
OMM delta sync shrinks the Jira Cloud migration cutover to minutes.
Cloud stays current in the background. The cutover window shrinks from a weekend to minutes.
Growth by acquisition leaves overlapping Jira instances with no single portfolio view.
Duplicate users and colliding project keys pile up across Data Center and Cloud instances with no resolution path.
OMM consolidates multiple Jira instances into one Cloud site by rule.
Key collisions and duplicate users are resolved by rule before anything moves. Includes Cloud-to-Cloud merges.
JCMA is Atlassian’s free, native tool for the core Jira Cloud migration, structure, configuration, workflows, users, and issue data. OMM extends JCMA for migrations that need delta or bi-directional sync, transformation, multi-instance consolidation, or Cloud-to-Cloud moves, the parts outside JCMA’s scope.
Yes. OMM supports project-level and phased migration, so specific projects or teams can move to Cloud on any criteria, date range, status, or owning team, on their own schedule instead of migrating a full Data Center instance at once.
Yes. JCMA handles the core migration, structure, users, and issue data, natively. OMM adds delta sync so Data Center stays current until cutover, and reconciles any model mismatches between source and target.
Audit and clean up Data Center data before migrating, obsolete projects, unused fields, inactive users, then validate Cloud against Data Center post-migration. OMM adds per-record reconciliation during the sync period, so mismatches are reported and retried rather than silently dropped.
Atlassian’s Jira Cloud Migration Assistant (JCMA) is the recommended starting point, it’s free and natively supported. For migrations that need continuous sync, transformation, consolidation, or archiving, OpsHub Migration Manager (OMM) and OpsHub Archive Manager (OAM) extend JCMA to cover those scenarios.
Book a free 30-minute consultation with our Jira migration experts. We'll assess your systems and design a risk-free migration roadmap.